Bar Bending Schedule for Pile Foundation with Calculations

July 1, 2025 Amit K. Pandey Bar Bending Schedule (BBS)

To clearly understand the bar bending schedule of a pile foundation, it is necessary to be familiar about the typical reinforcement details of a pile foundation. Pile foundation is a common type of deep foundation,

Continue reading

Bar Bending Schedule for Reinforced Concrete Beam

July 1, 2025 Amit K. Pandey Bar Bending Schedule (BBS)

Bar bending schedule provides the reinforcement calculation for reinforced concrete beam. It provides details of reinforcement cutting length, type of bends and bend length. We will take one example for reinforcement quantity calculations for a

Continue reading

Footing Bar Bending Schedule (BBS) – Estimation of Steel Quantity

July 1, 2025 Amit K. Pandey Bar Bending Schedule (BBS)

Bar bending schedule (BBS) of an concrete footing provides the reinforcement details and the total steel quantity required for the footing construction. The BBS and quantity of steel reinforcement required for a simply isolated footing

Continue reading

Recent Posts

  • Soil Sampling for Backfilling Work: Ensuring Proper Soil Quality & Structural Integrity
  • CBR Test – California Bearing Ratio: Procedure and Details
  • Compressive Strength Test of Concrete Cubes
  • Non-destructive testing (NDT) methods for concrete
  • Pull-Out Test | Semi-Destructive Test

Categories

  • Bar Bending Schedule (BBS)
  • Civil Engineer
  • Construction Materials
  • Construction Quality & Inspection Reporting
  • Non-Destructive Test (NDT)
  • Quality Control Test
  • Semi-Destructive Test (SDT)
  • Soil Testing
WordPress Theme: Mercia by ThemeZee.